The company in which we installed the system has been producing high-quality agricultural equipment and vehicles for more than 30 years.
Request
One of the project requirements was to create a continuous material flow between the assembly area and the paint area. The paint shop had to ensure top quality finish and a high energy efficiency.
Solution
We have built a transit tunnel consisting of two Extra Paint Booths in sequential line. Plus double access and safety doors to facilitate a lean organization of batches and material flow. The tunnel is separated by an industrial sectional door, which allows two independent zones to be created. In this way, it is possible to use only one zone to halve the power consumption or perform two different processing steps at the same time. The ventilation units are equipped with direct fired burners and two heat recovery systems, which increases the efficiency of the system and reduces operating costs.
To complete the system, a paint mixing room has been installed, sized for the industrial colour pump system. With a large 2-wing door to facilitate the handling of paint machinery and paint storage.